Preventive Maintenance Checklist

A working checklist for planning, running and recording routine equipment and facility maintenance.

A real, editable checklist below — tick, tap a line to rewrite, drag to reorder.

  • Preventive Maintenance Checklist
  • List critical assets
  • Group assets by equipment type
  • Find manufacturer manuals and intervals
  • Pull past work orders and failure history
  • Ask technicians what they check
  • Set frequency by criticality
  • Assign an owner to each checklist
  • Write each task as one action
  • Set pass/fail limits
  • Record asset ID, location, serial number
  • Confirm permits and lockout/tagout
  • Confirm PPE and stop-work criteria
  • Inspect guards, confirm fasteners tight
  • Lubricate, calibrate, check torque
  • Plan routine HVAC filter replacement
  • City FM minimum: spring cooling, fall heating
  • Test fire alarms and extinguishers
  • Inspect roof, gutters, walkways
  • Check plumbing for leaks and drains
  • Infrared scan electrical distribution panels
  • Record readings, photos, notes
  • Escalate results outside limits
  • Log time and parts used
  • Get supervisor and site sign-off
  • Review and update the checklist
Get Clear →

Tick the circles, tap any line to change it, drag the dots to reorder.

or save it on the webSave it on the web

Get this list on your phone

Point your phone's camera at the code.

TrueContext builds checklists around critical assets, then pulls manufacturer guidance and adjusts for operating conditions. FlowPath adds that following manufacturer recommendations avoids voiding warranties. This list covers setting up the plan, preparing each job, doing the checks, and recording and following up. It assumes facility or plant equipment and a technician doing the work. It leaves out industry-specific procedures such as oil and gas inspection. Tick each step only once it is done, so no check is skipped and every finding is recorded.

Why these items are on the list

  1. List critical assets. Focus on the assets that drive uptime, safety risk or output.
  2. Group assets by equipment type. Pumps, motors, compressors, valves and control panels are example groups; standardize the format across equipment types.
  3. Find manufacturer manuals and intervals. Adjust manufacturer intervals for duty cycle, temperature swings and contamination.
  4. Pull past work orders and failure history. Use them to shorten intervals on problem assets.
  5. Ask technicians what they check. They know what fails; reconcile their input with the manuals.
  6. Set frequency by criticality. Use criticality to decide what gets weekly, monthly or quarterly, not a generic calendar.
  7. Assign an owner to each checklist. Name the role responsible for completion, with supervisor review where required.
  8. Write each task as one action. One check per line; do not bundle several decisions into one item.
  9. Set pass/fail limits. Where measurements are not practical, a plain pass or fail will do.
  10. Record asset ID, location, serial number. So the record can be used later for audits and warranty claims.
  11. Confirm permits and lockout/tagout. Check these before work starts, along with required tools and calibration status.
  12. Confirm PPE and stop-work criteria. Note the hazards for the asset before anyone opens it up.
  13. Inspect guards, confirm fasteners tight. For example, check a coupling guard for cracks and missing fasteners.
  14. Lubricate, calibrate, check torque. TrueContext lists these, with belt tensioning and cleaning, as routine preventive tasks.
  15. Plan routine HVAC filter replacement. FlowPath gives replacing HVAC filters every three months as an example of routine maintenance.
  16. City FM minimum: spring cooling, fall heating. City Facilities Management lists these as the minimum HVAC checklists; its HVAC frequency line is an annual inspection.
  17. Test fire alarms and extinguishers. Also test emergency exits and AEDs where the building has them.
  18. Inspect roof, gutters, walkways. Part of the building exterior check, with siding and signage.
  19. Check plumbing for leaks and drains. Test water heaters too; City lists plumbing as an annual inspection.
  20. Infrared scan electrical distribution panels. City's George Campbell points out that downtime costs more than inspection time; City's list sets annual inspection.
  21. Record readings, photos, notes. Pressure, temperature and vibration readings, plus a photo if damage is found.
  22. Escalate results outside limits. Name the escalation path, the priority and who gets notified when a check fails.
  23. Log time and parts used. Also note any follow-up work that the inspection turned up.
  24. Get supervisor and site sign-off. Where required, so the check counts as complete.
  25. Review and update the checklist. Equipment, regulations and technician feedback change; revisit it periodically.

Tick it on your phone standing at the asset, so the record is made as the work happens. Share the list with the team and each person can see which checks are still open.

When to use it

Use it when setting up a maintenance program or before each scheduled round of inspections.